Malaysia Hotline: +603- 2141 8908
Feasibility
study report is one of the documents to be submitted to the China Government
for the purpose of application for registration of a Wholly Foreign Owned
Enterprise.
The
aim of a feasibility analysis is to conduct a systematic all-in study and proof
of the necessity and viability for kicking off a project in areas ranging from
technology, economy, market, finance, resources to environmental protection and
safety. Given relevant stipulations of the State and the particularities of the
specific city, a feasibility report should include the following items:
1.
The name, nature, address, and tenure of operation of the prospective
enterprise.
2.
The names of the investment parties, country (region) of registration, legal
address, the name, title and country of the legal person, and a profile of the
overseas investor (including capital credibility and operation prospects)
3.
Scope and scale of operation, which include specific product name, size of
production, marketing channels and ratio of domestic and overseas sales. Be
concrete and specific on the scope and scale which should be compatible with
the registered capital, operation site, major equipment and technical
competence of the company. Be exact and standard in wording.
4.
Market projections. It covers product properties, market demands both at home
and abroad and sales forecast.
5.
Production know-how and equipment. Source of the know-how, its suitability and
reliability should be specified. The number of the equipment, its model, scale,
place of origin and degree of depreciation are also to be spelled out.
6.
Production craftsmanship.
7.
The names, qualities and sources of major raw materials and back-up parts.
8.
Requirement list of land, factory premises, water, electricity, installed
capacity, fuel and means of transport (vehicles)
9.
Corporate setup and staff training. This includes total number of company
staff, its make-up (foreign staff, managers, technicians, and frontline
workers) and a tentative training program.
10.
Environmental impact analysis and training scheme (including waste water,
residue and gas).
11.
Investment calculations which cover sum total of investment, registered
capital, the proportions of capital contributions of the parties concerned, the
ratio, means, sources of capital contribution and the capital input plan.
Contact us
If you have further queries, please contact Tannet
24 hours Malaysia hotline:603-21418908;
24 hours Hong Kong hotline:852-27837818;
24 hours Hong Kong hotline:86-755- 36990589;
Email: mytannet@gmail.com
TANNET GROUP : http://www.tannet-group.net, http://en.tannet.com.my